HPO

Hot Shots: A slab of thickness 250 mm heated up uniformly

A slab of thickness 250 mm heated up uniformly to above 1,200 °C runs into a hot rolling mill to undergo forming. At the end of the rolling process, a steel strip is obtained in thicknesses between 1.2 and 20 mm and lengths from 100 m to 2 km.

(Source: SMS Siemag AG)

                                                                                                                  > View more

Related Topics
Video: Pusher furnace in action more
“The Bright World of Metals” is starting again more
Saarstahl banks on continuous casting technology from SMS Concast more
Indometal benefits from improving infrastructure and industrial growth in Indonesia more
Primetals receives final acceptance for electric arc furnace in Siberia more
wire and Tube 2018 to achieve record results more